Wednesday, December 23, 2020
Question:
Greetings,
For overhead service, what is the minimum clearance required from the bottom of a drip loop at the Weatherhead to the grade? The service is a 120/240-volt, single-phase, and supplies a residential dwelling.
Tom Simpson
A
Answer:
Hi Tom,
The minimum clearance from the grade to the lowest part of the drip loop should not be less than 10 feet. See Section 230.24(B).